| Year | Country | Client | Project | ||
| 2011 | Germany | Friedrich Duensing GmbH
Kleeblattstraße 2 31535 Neustadt Ortsteil Eilvese |
Protection pipe Da 500 SDR 11 for cable protection bundle, 2 x Da 125; 2 x Da 110; 3 x Da 63 SDR 11 |
718 |
660 |
| 2011 | Germany | Friedrich Duensing GmbH
Kleeblattstraße 2 31535 Neustadt Ortsteil Eilvese |
Cable protection bundle, 2 x Da 125; 2 x Da 110; 3 x Da 63 SDR 11 |
130 |
450 |
| 2011 | United Kingdom | Southern Gas Networks plc
St. Lawrence House Station Approach Horley Surrey RH6 9HJ |
The drilling of 2 no. 4,000m long x 20” diameter pilot holes, each drilled with a rig at either end of the crossing and requiring an intercept approx. 50m below the seabed. Scope of work included the preparation of the strings of 324 x 12.7mm steel gas pipes. Each pullback required stops for 2 no. intermediate welds. Ground conditions were very stiff clays and very dense sands. |
3926 |
508 |
| 2011 | Germany | TenneT Offshore GmbH
Bernecker Straße 70 95448 Bayreuth |
Connection of windpark SylWin I to German national grid (NOK, Nord-Ostsee-Kanal), 2 crossings
|
620 |
550 |
| 2011 | Germany | TenneT Offshore GmbH
Bernecker Straße 70 95448 Bayreuth |
Connection of windpark HelWin I to German national grid (NOK, Nord-Ostsee-Kanal), 2 crossings
|
620 |
550 |
| 2011 | Germany | TenneT Offshore GmbH
Bernecker Straße 70 95448 Bayreuth |
Connection of windpark HelWin II to German national grid (NOK, Nord-Ostsee-Kanal), 2 crossings |
620 |
550 |
| 2011 | Italy | Client: Snam Rete Gas - Piazza S. Barbara, 7 - 20097 S. DONATO MILANESE (MI), Italy
Main Contractor: SAIPEM - Via Toniolo, 1 - 61032 FANO (PU), Italy |
1 of 3 crossings
|
440 |
1200 |
| 2011 | Italy | Client: Snam Rete Gas - Piazza S. Barbara, 7 - 20097 S. DONATO MILANESE (MI), Italy
Main Contractor: SAIPEM - Via Toniolo, 1 - 61032 FANO (PU), Italy |
1 of 3 crossings
|
440 |
250 |
| 2011 | United Kingdom | Rayden Engineering Limited
Wentworth House Wentworth Street Ilkeston, Derbyshire DE7 5TF |
HDD through very stiff clay and limestone for gas pipeline below river valley |
480 |
850 |
| 2011 | Germany | TenneT TSO GmbH
Bernecker Straße 70 95448 Bayreuth |
DolWin1, Oase, HDD1
|
550 |
584 |