Search our reference database
Country    
Year from   until Material / Bundle  Steel  PE  Bundle
Length from * [m] to * [m] On-/ offshore   Onshore  Offshore 
Diameter from * [mm] to * [mm] Soil  soft  hard

Clear form

 
*) Recommendation: enter a range of values in these fields for better search results.
List of references
Total records:  434 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2004  Italy  Snamprogetti S.p.A
Unita ACQ-S
Casella Postale 76
20097 San Donato Milanese 

Feasibility study: Adriatic LNG Terminal - Pipelines FEED Study and Construction - Methodology Report for HDD in connection with a landfall project 

2004  Italy  Snamprogetti S.p.A.
Unita ACQ-S
Casella Postale 76
20097 San Donato Milanese (Milano) 

Sakhalin II Phase 2 Project Offshore
Pipelines and Cables
Feasibility Study for HDD Approach in Offshore areas 

2009  Portugal  Client: EDP Gas, Rua Linhas de Torres, 41, 4350-214 Porto, Portugal
Main Contractor: CME - Construcao e Manutencao, Electromecanica, S.A., Delegacao C213, Rua 5 - Fraccao A - Lote B 8, Zona Industrial da Mota, 3830-527 Gafanha da Encarnacao, Portugal 

Crossing of Rio Cavado 

390 

160 

2014  Italy  Client: SARPOM, Via Vigevano 43, 28069 S. Martino di Trecate, Italy
Main Contractor: Guatelli S.p.a., Via Novara 166, Trecate 28069, Italy 

Bormida 2
A river and hill crossing by HDD with a difference of height between the entry and exit point, oil pipeline
Trecate - Quiliano DN 200 (8") 

328 

200 

2014  Italy  Client: SARPOM, Via Vigevano 43, 28069 S. Martino di Trecate, Italy
Main Contractor: Guatelli S.p.a., Via Novara 166, Trecate 28069, Italy 

Bormida 3 + 4
Construction of a double river crossing by HDD, oil pipeline
Trecate - Quiliano DN 200 (8") 

945 

200 

1996  Germany  Landkreis Weilheim/Schongau
Puettrichtstrasse 8
82362 Weilheim 

Rehabiliation darinage pipes of landfill in Erbenschwang,
replacement of stoneware pipes by PE-HD pipes Da 140 x 15,6 mm 

255 

220 

1996  Germany  Landkreis Weilheim/Schongau
Puettrichtstrasse 8
82362 Weilheim 

Rehabiliation darinage pipes of landfill in Erbenschwang,
replacement of ceramic pipes by PE-HD pipes Da 140 x 15,6 mm 

255 

220 

1996  Germany  Deutsche Telekom AG, NL 2 Potsdam,
Gueterfelder Damm 87 - 91,
14532 Stahnsdorf and Telekomunikacja Polska S.A.,
ul. 23 Lutego 26,
60-967 Poznan/PL 

Crossing of the river "Oder"at Blyen / Kostrzyn,
rock drilling, cable protection pipe,
Pe-HD pipe Da 160 x 22,1 mm 

515 

250 

1999  Italy  SNAM,
Via Agadir 38,
20097 S. Donato, Milan 

Crossing of the river Adda in Bergamo/Lecco,
steel pipe DN 150 

1206 

250 

2011  Italy  Client: Snam Rete Gas - Piazza S. Barbara, 7 - 20097 S. DONATO MILANESE (MI), Italy
Main Contractor: SAIPEM - Via Toniolo, 1 - 61032 FANO (PU), Italy 

1 of 3 crossings
1 x DN 1200 (48") gas pipes
1 x DN 250 (10") cable ducts 

440 

250 

|< <<   1 2 3 4 5 6 7 8 9 10 of 44  >> >|  

© 2005-2016 LMR Drilling GmbH