List of references
Total records:  435 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2011  Germany  TenneT TSO GmbH
Bernecker Strasse 70
95448 Bayreuth 

DolWin1, Oase, HDD2
HDD landfall for offshore wind park 

550 

584 

2011  Germany  TenneT TSO GmbH
Bernecker Strasse 70
95448 Bayreuth 

DolWin1, Hilgenriedersiel, HDD1
HDD landfall for offshore wind park 

1155 

584 

2011  Germany  TenneT TSO GmbH
Bernecker Strasse 70
95448 Bayreuth 

DolWin1, Grohdepolder, HDD1
HDD landfall for offshore wind park 

450 

584 

2011  Germany  TenneT TSO GmbH
Bernecker Strasse 70
95448 Bayreuth 

DolWin1, Grohdepolder, HDD2
HDD landfall for offshore wind park 

450 

584 

2011  Germany  TenneT TSO GmbH
Bernecker Strasse 70
95448 Bayreuth 

DolWin1, Hilgenriedersiel, HDD2
HDD landfall for offshore wind park 

1150 

584 

2011  Germany  Wasser- und Schifffahrtsamt Brunsbuettel
Alte Zentrale 4
25541 Brunsbuettel 

Crossing of the "Nord-Ostsee-Kanal", near Brunsbuettel, underneath a lock for a HDPE-bundle for data transmission cables 

620 

457 

2011  Italy  Client: ESSO Italiana Srl, Via Vigevano, 43, 28069 S. Martino di Trecate (NO), Italy
Main Contractor: CII Guatelli SpA, Via Novara 166, 28059 Trecate (NO), Italy 

Sesia River crossing, to construct a new tract of DN 250 oil pipeline, 1207 m long, has been carried out for gravel treatment
 

1207 

400 

2011  United Kingdom  Southern Gas Networks plc
St. Lawrence House
Station Approach
Horley
Surrey RH6 9HJ 

Solent Gas Transits Gas Pipeline, Phase 2 - The drilling of a 3,926 m long x 20" diameter pilot holes, each drilled with a rig at either end of the crossing and requiring an intercept approx. 50m below the seabed. Scope of work included the preparation of the strings of 324 x 12.7mm steel gas pipes. Each pullback required stops for 2 no. intermediate welds. Ground conditions were very stiff clays and very dense sands. 

3940 

508 

2010  United Kingdom  RWE npower Plc.
Windmill Hill Business Park
Whitehill Way
Swindon Wiltshire
SN5 6PB
United Kingdom 

Crossing of Milford Haven between Blackbridge Depot and South Haven as part of the Pembroke South Haven Gas Pipeline. Installation of 1 pc. Steel pipe DN 450 

3004 

650 

2010  Netherlands  NV Nederlandse Gasunie
Postbus 19
9700 MA Groningen 

HDD Ketelmeer, drilling length 2700 m, support to Nacap with steering and drilling services 

2700 

660 