Search our reference database
Country    
Year from   until Material / Bundle  Steel  PE  Bundle
Length from * [m] to * [m] On-/ offshore   Onshore  Offshore 
Diameter from * [mm] to * [mm] Soil  soft  hard

Clear form

 
*) Recommendation: enter a range of values in these fields for better search results.
List of references
Total records:  434 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2015  France  Client: TIGF - Transport et Infrastructures Gaz France, 40 Avenue de l'Europe, 64010 Pau, France
Joint Venture with: SPAC, 13 rue Madame de Sanzillon, 92110 Clichy, France 

Gas Pipeline Deviation DN 350, Ossun - Bernac-Debat, Hautes-Pyrenees, France, Underground intersection in adverse ground conditions, topsoil: 20 m gravel/cobbles 

576 

560 

2015  Spain  Client: ACUA ES, Aguas de las cuencas de Espana SA, Spain
Main Contractor: COMSA, S.A.U., 48001 Bilbao, Spain 

Autovia del Agua, section Cicero - Colindres, crossing of the Ria del Escalante, 3-dimensional curve in strongly karstic limestone with great requirement for cementations to seal formation 

685 

1100 

2014  Germany  Client: Vattenfall Europe Waerme AG, Puschkinallee 52, 12435 Berlin, Germany
Main Contractor: ARGE Dueker Mueggelspree, Scharnweberstrasse 24, 13405 Berlin, Germany 

Steamline (Distance Heating) in Berlin - Koepenick, Crossing of River Mueggelspree in City of Berlin-Koepernick, Concentric district heating Pipeline, steel pipe DN 350 inside steel pipe DN 550, 2 parallel HDD for hot and return water. 

300 

762 

2014  Italy  Client: SARPOM, Via Vigevano 43, 28069 S. Martino di Trecate, Italy
Main Contractor: Guatelli S.p.a., Via Novara 166, Trecate 28069, Italy 

Bormida 2
A river and hill crossing by HDD with a difference of height between the entry and exit point, oil pipeline
Trecate - Quiliano DN 200 (8") 

328 

200 

2014  Italy  Client: SARPOM, Via Vigevano 43, 28069 S. Martino di Trecate, Italy
Main Contractor: Guatelli S.p.a., Via Novara 166, Trecate 28069, Italy 

Bormida 3 + 4
Construction of a double river crossing by HDD, oil pipeline
Trecate - Quiliano DN 200 (8") 

945 

200 

2014  Hungary  KVV Pipeline Construction Co. Ltd., 207 Bajcsy-Zsilinszky Street, Siofok, H-8600, Hungary
 

The HDD connected a 32" gas pipeline from Slovakia to Budapest, Hungary under the Natura2000 protected area. 

450 

1020 

2014  Germany  TenneT Offshore
Bernecker Strasse 70
95448 Bayreuth 

Landfalls from Wadden Sea mudflats to mainland, 4 parallel cable ducts for HVDC system 

590 

585 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

275 

460 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

284 

460 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formation 

291 

460 

|< <<   1 2 3 4 5 6 7 8 9 10 of 44  >> >|  

© 2005-2016 LMR Drilling GmbH