Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

306 

460 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

337 

460 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

352 

460 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

367 

460 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

383 

460 

2014  United Kingdom  Client: National Grid Gas PLC, 1 - 3 Strand, London, WC2N 5EH, UK
Main Contractor: Prysmian Cable & Systems Ltd, Chickenhall Lane, Eastleigh, Hampshire, SO50 6YU, UK 

9 no. parallel drills below the River Dee near Chester, SDR17 PE ducts, drilling through Coal Measures rock formations 

393 

460 

2014  United Kingdom  Client: Scottish Hydro Electric Transmission, Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ, Scotland
Main Contractor: J. Murphy & Sons, Hiview House, Highgate Road, London NW5 1TN, UK 

Ealing to Bridge Road
4 no. parallel bores through London Clay with the installation of 4 no. PE ducts into each bore. 13.5 km of ducts installed in total 

828 

600 

2014  United Kingdom  Client: Scottish Hydro Electric Transmission, Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ, Scotland
Main Contractor: J. Murphy & Sons, Hiview House, Highgate Road, London NW5 1TN, UK 

Ealing to Bridge Road
4 no. parallel bores through London Clay with the installation of 4 no. PE ducts into each bore. 13.5 km of ducts installed in total 

827 

600 

2014  United Kingdom  Client: Scottish Hydro Electric Transmission, Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ, Scotland
Main Contractor: J. Murphy & Sons, Hiview House, Highgate Road, London NW5 1TN, UK 

Ealing to Bridge Road
4 no. parallel bores through London Clay with the installation of 4 no. PE ducts into each bore. 13.5 km of ducts installed in total 

826 

600 

2014  United Kingdom  Client: Scottish Hydro Electric Transmission, Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ, Scotland
Main Contractor: J. Murphy & Sons, Hiview House, Highgate Road, London NW5 1TN, UK 

Ealing to Bridge Road
4 no. parallel bores through London Clay with the installation of 4 no. PE ducts into each bore. 13.5 km of ducts installed in total 

826 

600 