Search our reference database
Country    
Year from   until Material / Bundle  Steel  PE  Bundle
Length from * [m] to * [m] On-/ offshore   Onshore  Offshore 
Diameter from * [mm] to * [mm] Soil  soft  hard

Clear form

 
*) Recommendation: enter a range of values in these fields for better search results.
List of references
Total records:  435 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2014  United Kingdom  Client: Scottish Hydro Electric Transmission, Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ, Scotland
Main Contractor: J. Murphy & Sons, Hiview House, Highgate Road, London NW5 1TN, UK 

Ealing to Bridge Road
4 no. parallel bores through London Clay with the installation of 4 no. PE ducts into each bore. 13.5 km of ducts installed in total 

826 

600 

2014  United Kingdom  Client: Scottish Hydro Electric Transmission, Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ, Scotland
Main Contractor: Nexans Norway AS, P.O.Box 6450, Etterstad, N-0605 Oslo, Norway 

Hunterston - 2 no. cable landfall drills from the SW Scottish coast at West Kilbride. Each drill being 500 m in length with a 560 mm PE duct installed. Ground conditions predominately sand 

500 

750 

2014  United Kingdom  Client: Scottish Hydro Electric Transmission, Inveralmond House, 200 Dunkeld Road, Perth, Perthshire, PH1 3AQ, Scotland
Main Contractor: Nexans Norway AS, P.O.Box 6450, Etterstad, N-0605 Oslo, Norway 

Hunterston - 2 no. cable landfall drills from the SW Scottish coast at West Kilbride. Each drill being 500 m in length with a 560 mm PE duct installed. Ground conditions predominately sand 

503 

750 

2014  United Kingdom  Green Highland Renewables Ltd.
Arran House,
Arran Road,
Perth, PH1 3DZ
U.K. 

Chonais Hydro Power Project Water Pipeline through extremely strong and abrasive rocks. Continuous fall gradient with free-draining borehole and 50 m elevation difference from top to bottom of borehole. 

705 

1150 

2013  Spain  Client: Aguas de Galicia
Main Contractor: UTE EDAR ARES-FENE, Rua do Paseo, no 25. Entresuelo, 32.003 Ourense, Spain 

Ares Outfall to Atlantic Ocean, hard rock cliff crossing for sewer line 

200 

813 

2013  Germany  Client: K+S KALI GmbH, Werk Neuhof-Ellers, Am Kaliwerk 6, 36119 Neuhof, Germany
Main Contractor: ARGE Salzwasserleitung Neuhof, Karl-Ebner-Strasse, 36132 Eiterfeld, Germany 

Crossing of Fulda Valley for a saltwater pipeline in difficult soil situation; sandstone overlaid with gravel and bolders, stabilised critical section by casing installation on both ends of the crossing. 

266 

550 

2013  United Kingdom  Client: ESB International, Stephen Court, 18-21 St. Stephen's Green, Dublin 2, Ireland
Main Contractor: Spiecapag UK Ltd, 46 West Bar, Banbury, Oxfordshire, OX16 9RZ 

HDD below landfill deposits and existing colvert running alongside the Manchester Ship Canal foring part of a gas supply pipeline to the new-build Carrington Power Station, soil: weak sandstone, gravels and clay 

1100 

860 

2013  Ireland  Client: Bord Gais Networks, Gasworks Road, Cork, Ireland
Main Contractor: Roadbridge Ltd, Ballyclough, Ballysheedy, Co. Limerick, Ireland 

HDD across River Barrow forming part of a gas supply pipeline to the new-build Great Island Power Station, soil: Rhyolite and meta-sediments 

945 

610 

2013  Germany  TenneT Offshore
9. Beteiligungsgesellschaft mbH
Bernecker Strasse 70
95448 Bayreuth 

Hilgenriedersiel:
Landfalls from Wadden Sea mud flats to mainland. 2 parallel cable ducts for HVDC system. 

1280 

600 

2013  Germany  TenneT Offshore
9. Beteiligungsgesellschaft mbH
Bernecker Strasse 70
95448 Bayreuth 

Landfall island Norderney:
Landfall from North Sea to dune island, crossing of dunes. 2 parallel cable ducts for HVDC system. 

680 

600 

|< <<   2 3 4 5 6 7 8 9 10 11 of 44  >> >|  

© 2005-2016 LMR Drilling GmbH