
List of references
| Year | Country | Client | Project | ||
| 2006 | United Kingdom | Transco
Claylane Woods, off Watling Street, DA 11 0 Gravesend, Kent |
Crossing of a railway line at Singelwell for a gas line 762 x 19,1 mm over a distance of 445 m in rock.
|
445 |
950 |
| 2006 | Italy | Praoil Oledotti Italiani,
Piazza della Vittoria 16121 Genova |
Crossing of Ticino River for a pipe bundle: 273,1 x 11,1 mm; 219,1 x 12,7 mm; 114,3 x 6,0 mm; taking into account massive gravel layers
|
1600 |
650 |
| 2006 | France | TOTAL
Centre Europeen de Recherche et Technique BP 19 - 76700 Harfleur |
Crossing at TOTAL Refinery LAVERA, close to Marseille in carstic rock, L = 675 m for one steel pipe DN 400 |
675 |
400 |
| 2006 | United Kingdom | Pierse Contracting Ltd.
Birmayne House, Mulhuddart Dublin 15 Ireland |
Two parallel crossings at waterford for the main drainage system in rock.
|
800 |
800 |
| 2006 | United Kingdom | Transco
Claylane Woods, off Watling Street, DA 11 0 Gravesend, Kent |
Crossing of a railway line at Singelwell for a gas line 762 x 19,1 mm over a distance of 445 m in rock. |
445 |
750 |
| 2006 | Italy | Praoil Oledotti Italiani,
Piazza della Vittoria 16121 Genova |
Crossing of Ticino River for a pipe bundle:
|
1600 |
275 |
| 2006 | Germany | EWE AG
Donnerschweerstr. 22-26 26123 Oldenburg |
Crossing of the Küstenkanal in Oldenburg for a sleeve pipe HDPE DA 630 SDR 11 PE 100 |
178 |
600 |
| 2006 | Italy | Snam Rete Gas
Distretto Nord Occidentale Coorso Traiano, 61/A 10154 Torino |
Crossing of a vine yard with gasline DN 400 |
629 |
400 |
| 2006 | Germany | EON Engineering GmbH
Bergmannsglückstrasse 41 - 43 45896 Gelsenkirchen |
Crossing of Lippe River with a steel pipe DN 400 and a sleeve pipe HDPE DN 100 SDR 11 in marlstone
|
399 |
400 |
| 2006 | Belgium | Wintershall / WINGAS GmbH
Friedrich-Ebert-Straße 160 34119 Kassel |
Crossing from Netherlands to Belgium on BASF plant in Antwerp Harbour for a steel pipe DN 500 and a HDPE pipe DN 150 |
218 |
500 |
© 2005 LMR Drilling GmbH