List of references
Total records:  437 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2012  Italy  Client: Snam Rete Gas - Piazza S. Barbara, 7 - 20097 S. DONATO MILANESE (MI), Italy
Main Contractor: SAIPEM - Via Toniolo, 1 - 61032 FANO (PU), Italy 

3 of 3 crossings
2 x DN 1200 (48"") gas pipes 

470 

1450 

2012  Italy  SNAM Rete Gas
Piazza Santa Barbara, 7
20097 San Donato Milanese (MI)
Italy 

Scope of the project was to lay a new gas pipeline tract under a landslide, that in 2011 damaged the existing gas pipeline. The HDD crossed stiff clays and claystones and was 1071 m long, up to 30 m depth. 

1071 

445 

2012  Denmark  N1 A/S
Ryhavevej 50
8210 Arhus V
Denmark 

Crossing of Limfjord near Aalborg 

1314 

700 

2012  United Kingdom  J. Murphy & Sons
Hiview House
Highgate Road
London
NW5 1TN 

Breagh Offshore Gas Pipeline Crossing of River Tees. One pipe 20" and two pipes 3 

740 

702 

2012  Spain  Ferrovial Agroman, S.A.
C/Ribera del Loira, 42
28042 Madrid
Spain 

HDD Outfall for Sewage Pipe, Gorliz, near Bilbao
 

490 

1050 

2012  Spain  Ferrovial Agroman, S.A.
C/Ribera del Loira, 42
28042 Madrid
Spain 

HDD Outfall for Sewage Pipe, Gorliz, near Bilbao 

980 

960 

2012  Germany  Client: GA Energieanlagenbau Nord GmbH, Frankenring 31 - 33, 30855 Langenhagen, Germany
Main Contractor: TenneT TSO GmbH, Bernecker Str. 70 , 95448 Bayreuth, Germany 

Installation of cable conduit under the river Ems as part of the DolWin windfarm connection. 

1320 

311 

2012  Germany  Client: GA Energieanlagenbau Nord GmbH, Frankenring 31 - 33, 30855 Langenhagen, Germany
Main Contractor: TenneT TSO GmbH, Bernecker Str. 70 , 95448 Bayreuth, Germany 

Installation of cable conduit under the river Ems as part of the DolWin windfarm connection 

1320 

311 

2012  Spain  Client: NATURGAS ENERGIA, Plaza Pio Baroja 3 (2a planta), 48001 Bilbao, Spain
Main Contractor: COLLOSA, C/ Aluminio, Parcela 17, 47012 Valladolid, Spain 

Crossing of the ria de Barbadun, Muskiz, Bilbao Gas Pipeline Bilbao - Treto, DN 600 + DN 100 

620 

850 

2012  Spain  Client: Augas de Galicia, Praza de Camilo Diaz Balino, 15704 Santiago de Compostela, A Coruna, Spain
Main Contractor: CONSTRUCTORA SAN JOSE, S.A., C/ ROSALIA DE CASTRO 44, 36.001 PONTEVEDRA, Spain 

Emisario de la EDAR de San Cibrao, Cervo, Sea Outfall from WWTP in San Cibrao, Cervo, Galicia 

660 

413 