List of references
Total records:  438 
Year  Country  Client   Project  

Length
[m]
 

Bore-
hole [mm]
 

2012  Spain  Client: Augas de Galicia, Praza de Camilo Diaz Balino, 15704 Santiago de Compostela, A Coruna, Spain
Main Contractor: CONSTRUCTORA SAN JOSE, S.A., C/ ROSALIA DE CASTRO 44, 36.001 PONTEVEDRA, Spain 

Emisario de la EDAR de San Cibrao, Cervo, Sea Outfall from WWTP in San Cibrao, Cervo, Galicia 

660 

413 

2012  Germany  Wasserbeschaffungsverband Elbmarsch
Koehlerweg 28
21365 Adendorf 

Crossing of River Elbe near Neu-Garge with a drinkwater line PE 180 mm inside steel casing 

1585 

400 

2012  France  Client: GRT Gaz
Main Contractor: SPAC, 76 r Blaise Pascal, 93600 Aulnay Sous Bois, France 

Installation of a gas pipeline DN 150 near the city Cambrai under the Canal de Saint Quentin and the river l'Escaut  

905 

310 

2011  Germany  Friedrich Duensing GmbH
Kleeblattstrasse 2
31535 Neustadt Ortsteil Eilvese 

Protection pipe Da 500 SDR 11 for cable protection bundle, 2 x Da 125; 2 x Da 110; 3 x Da 63 SDR 11 

718 

660 

2011  Germany  Friedrich Duensing GmbH
Kleeblattstrasse 2
31535 Neustadt Ortsteil Eilvese 

Cable protection bundle, 2 x Da 125; 2 x Da 110; 3 x Da 63 SDR 11 

130 

450 

2011  United Kingdom  Southern Gas Networks plc
St. Lawrence House
Station Approach
Horley
Surrey RH6 9HJ 

Solent Gas Transits Gas Pipeline, Phase 2 - The drilling of a 3,926 m long x 20" diameter pilot holes, each drilled with a rig at either end of the crossing and requiring an intercept approx. 50m below the seabed. Scope of work included the preparation of the strings of 324 x 12.7mm steel gas pipes. Each pullback required stops for 2 no. intermediate welds. Ground conditions were very stiff clays and very dense sands. 

3926 

508 

2011  Germany  TenneT Offshore GmbH
Bernecker Strasse 70
95448 Bayreuth 

Connection of windpark SylWin I to German national grid (NOK, Nord-Ostsee-Kanal), 2 crossings
 

620 

550 

2011  Germany  TenneT Offshore GmbH
Bernecker Strasse 70
95448 Bayreuth 

Connection of windpark HelWin I to German national grid (NOK, Nord-Ostsee-Kanal), 2 crossings
 

620 

550 

2011  Germany  TenneT Offshore GmbH
Bernecker Strasse 70
95448 Bayreuth 

Connection of windpark HelWin II to German national grid (NOK, Nord-Ostsee-Kanal), 2 crossings 

620 

550 

2011  Italy  Client: Snam Rete Gas - Piazza S. Barbara, 7 - 20097 S. DONATO MILANESE (MI), Italy
Main Contractor: SAIPEM - Via Toniolo, 1 - 61032 FANO (PU), Italy 

1 of 3 crossings
1 x DN 1200 (48") gas pipes
1 x DN 250 (10") cable ducts 

440 

1200 